Cranleigh School

Education — Cranleigh — Cranleigh School

This project consisted of a two storey steel frame building erected over existing squash court building. The existing building was adapted to form a café, lecture theatre and toilet facilities. A further 21 class rooms were also created.

NRT Building Services Group was contracted to install the complete electrical installation to include:

  • Power
  • Data
  • Containment
  • LED Lighting systems
  • Lightning Protection
  • Life Safety Systems

The design of the building having exposed beams and vaulted ceilings required the lighting installation to be suspended. Controls were DALI by Whitecroft.

This is the third project we have completed at Cranleigh School.

Sitting in grounds of 280 acres of Surrey countryside and having roots as a Community School launched in 1865.

Back to Projects

Back to top
We use cookies to give you the best possible experience on our web site. Please refer to our Privacy Policy for more information.